Index of /project/LIDCO Air Compressor 17735/17735/DOCUMENTS by Mohamadreza/ENG Documents/
Name
Last Modified
Size
Parent Directory
001 Vendor Print Index & Schedule
2026-06-08 11:08
-
002 Piping & Instrument Diagram
2026-06-08 11:08
-
003 General Arrangement Drawing (incl foundation load details)
2026-06-08 11:09
-
004 3D model (STP)
2026-06-08 11:09
-
005 Wiring Diagram (including Terminal Diagram) for
2026-06-08 11:09
-
006 IO list
2026-06-08 11:09
-
007 Outline Dimensional Drawings for LCP Panel and Junction Box
2026-06-08 11:09
-
008 Inspection & Test Plan (ITP)
2026-06-08 11:09
-
009 Utility Consumption
2026-06-08 11:09
-
010 Main Motor Data Sheet
2026-06-08 11:09
-
011 Equipment Data Sheet
2026-06-08 11:10
-
012 Inter After Cooler Data Sheet
2026-06-08 11:10
-
013 Instrument Data Sheet and Catalogue
2026-06-08 11:10
-
014 Commissioning and Start-up Spares
2026-06-08 11:10
-
015 FAT Procedure (incl full unit mechanical run test procedure)
2026-06-08 11:10
-
016 NDE Procedure
2026-06-08 11:11
-
017 Package Nameplate Drawing
2026-06-08 11:11
-
018 Hydrotest Procedure
2026-06-08 11:11
-
019 Surface Preparation and Painting Procedure
2026-06-08 11:11
-
020 Index of Vendor Data Book
2026-06-08 11:11
-
021 Index of Instruction and Operating Manual
2026-06-08 11:11
-
022 Control philosophy and Interlock Description
2026-06-08 11:11
-
023 Preservation, Packing & Shipping Procedure
2026-06-08 11:11
-
024 Detail Drawings for Coolers
2026-06-08 11:11
-
025 Detail Drawings for Pulsation Dampers
2026-06-08 11:12
-
026 Pulsation Study Approach 1 Calculations
2026-06-08 11:12
-
027 Welding Book (PQR WPS)
2026-06-08 11:12
-
028 WPQ
2026-06-08 11:12
-
029 Cause & Effect Chart
2026-06-08 11:13
-
030 Tie-in Nozzle Loads
2026-06-08 11:13
-
031 Loop Diagrams
2026-06-08 11:13
-
032 Control and shut down Logic Block Diagram
2026-06-08 11:13
-
033 (Pre-) Commissioning Procedure
2026-06-08 11:13
-
034 Instrument Index
2026-06-08 11:13
-
035 Quality Manual
2026-06-08 11:13
-
036 Instrument Hook-up Drawing
2026-06-08 11:13
-
037 Earthing Diagrams
2026-06-08 11:13
-
038 Spare Parts for 2 years Operation (SPIR)
2026-06-08 11:13
-
039 Sub-Supplier List
2026-06-08 11:13
-
040 PSV Data Sheets
2026-06-08 11:14
-
041 PSV sizing calculations
2026-06-08 11:14
-
042 Control Valve Data Sheet
2026-06-08 11:14
-
043 Noise Data Sheet
2026-06-08 11:14
-
044 Lubrication List
2026-06-08 11:14
-
045 Instrument Cable Schedule
2026-06-08 11:14
-
046 Vendor Data book
2026-06-08 11:28
-
047 Technical Operating and Maintenance Manual
2026-06-08 11:32
-
048 Monthly Progress Report
2026-06-08 11:33
-
049 Line List
2026-06-08 11:33
-
050 Inspection Notification
2026-06-08 11:33
-
051 Time Schedule (base-line)
2026-06-08 10:54
-
MPR
2026-06-08 11:33
-